Rubber Material | PU NBR |
---|---|
Piston Core | 42CrMo |
Size | 100mm 110mm,120mm,130mm Etc |
Place of Origin | CHINA |
Brand Name | ATO |
Lift | 7m |
---|---|
Rotate Speed | 1460 Rpm |
Flow | 6.5-9 .0 M3/ H |
Overall Dimension | 400×335×26 |
Place of Origin | CHINA |
Discharge Piping Materials | American Cast Iron A487-9D |
---|---|
Place of Origin | CHINA |
Brand Name | ATO |
Product | GD PZ 10/11 Fluid End Parts |
---|---|
OEM P/N | 302PZL029B |
Application | Drill Mud Pump Parts |
Industry | Drilling Oil & Gas |
Work Pressure | 5000PSI |
Product | High Pressure Piston |
---|---|
Type | BOMCO HH GD National Oilwell |
Application | Drill Mud Pump Parts |
Industry | Drilling Oil & Gas |
Material | Dual Duro Polyurethane |
Max. Hook Load KN(1bs) | 900 (200000)~9000 (2000000) |
---|---|
Dia. Of Wire Line Mm(in) | 26(1)~48(1 7/8) |
O.D. Of Sheaves Mm(in) | 762(30)~1829(72) |
Number Of Sheaves | 5~8 |
Delivery Time | 45 work days |
Max.hook Load, KN(lbs) | 500 (110000)~6750 (1500000) |
---|---|
Spring Travel Length ,mm | 140~220 |
Main Hook Open Size, Mm | 130~235 |
Weight ,kg | 419~7300 |
Packaging Details | Wooden |
Max. Hook Load KN (1bs) | 500 (110000)~9000 (2000000) |
---|---|
Dia. Of Wire Line Mm(in) | 24 (15/16) ~ 48 (1 7/8) |
Number Of Sheaves | 4~7 |
O.D. Of Sheaves Mm | 500~1829 |
Packaging Details | Wooden box |
Material | Gray Iron |
---|---|
Size | Standard |
Application | Mud Pump Parts |
Certificate | API |
Industry | Drilling Oil & Gas |
Material | PU |
---|---|
Certificate | API |
Size | Request |
Product | Mud Pump Piston |
Application | Mud Pump Parts |