| Max.Load KN | 1350 |
|---|---|
| Drilling Line Size Mm(in) | 29(1 1/8) |
| Highlight | Drilling Line Size Travelling Block,1350 KN Travelling Block |
| Packaging Details | WOODEN BOX |
| Delivery Time | 10-15 WORK DAYS |
| Max.Hook Load(KN) | 1350 |
|---|---|
| O.D.of Sheaves Mm(in) | 915(36) |
| Number Of Sheaves | 5 |
| Dia. Of Wire Line | 26(1) |
| Highlight | 1350 KN Traveling Block |
| Max. Hook Load | 600~4500 KN |
|---|---|
| Diameter Of Sheaves | 24~60 In |
| Diameter Of Wire Line | 22~35 Mm |
| Major Hook Opening | 110~220mm |
| Highlight | 600~4500 KN Traveling Block,600 KN Traveling Block,4500 KN Traveling Block |
| Max. Hook Load | 1700 (350,000) |
|---|---|
| O.D. Of Sheaves | 1005 (40) |
| Dia. Of Wire Line | 29 (11/8) |
| Number Of Sheaves | 5 |
| Highlight | 350,000 lbs Travelling Block,1700 kN Travelling Block,1005 mm Travelling Block |
| The Maximum Hook Load | 900 |
|---|---|
| Outer Diameter Pulley | 762 |
| Pulley Number | 4 |
| Rope Diameter | 26 |
| Highlight | Hook Travelling Block,762 mm Travelling Block,900 KN Travelling Block |
| Max. Hook Load KN (1bs) | 500 (110000)~9000 (2000000) |
|---|---|
| Dia. Of Wire Line Mm(in) | 24 (15/16) ~ 48 (1 7/8) |
| Number Of Sheaves | 4~7 |
| O.D. Of Sheaves Mm | 500~1829 |
| Highlight | 7 Sheaves Mud Pump Travelling Block,1829mm Sheave Travelling Block,500KN Hook Travelling Block |
| Max Hook Load | 1700~9000KN |
|---|---|
| The Pulley OD | 915~1830mm |
| Highlight | 9000KN Truck Mounted Drilling Rig,1700KN Truck Mounted Drilling Rig,API 8C Travelling Block |
| Packaging Details | Wooden box |
| Payment Terms | T/T, L/C |
| Max.Hook Load(KN) | 1350 |
|---|---|
| O.D.of Sheaves Mm(in) | 475 (18 3/4) |
| Number Of Sheaves | 1+4 |
| Dia. Of Wire Line | 24(15/16) |
| Highlight | Max.Hook Load Crown Block,900 (KN) Crown Block,900 KN Crown Block |
| Max.Load KN | 300 |
|---|---|
| Drilling Line Size Mm | 24 |
| Sheaves O.D Mm | 475 |
| Number Of Sheaves | 4 |
| Highlight | 300 KN Crown Block Drilling line,475 mm Crown Block Drilling line,24 mm Crown Block Drilling line |
| Max Hook Load,kN | 675 |
|---|---|
| Wireline,mm | 22 |
| Highlight | 22 mm Traveling Hook,675 kN Traveling Hook,Wireline Traveling Hook |
| Packaging Details | WOODEN BOX |
| Delivery Time | 10-15 WORK DAYS |